Project Overview

  • Country / Destination: Chengdu, Sichuan Province, China

  • End-User Client: Power Construction Corporation of China (PowerChina / Sinohydro Bureau 7)

  • Equipment Model: SJG20-90 Customized Heavy Duty Hydraulic Upender

  • Rated Load Capacity: 20,000 kg (44,092 lbs) continuous tilting payload

  • Cradle Platform Geometry: Massive L-shaped structure (3,000 mm×4,800 mmclamping platform + 4,800 mm×7,800 mm support platform)

  • Flipping Angle: 90° (Driven by dual hydraulic cylinders)

  • Workpiece Specifications: 3-meter long semi-circular concrete tunnel segments  with outer diameters of 6.6 m, 7.2 m, and 7.7 m

  • Maximum Elevated Height: Strictly limited below 8,900 mm (29.20 ft) at 90° maximum tilt

  • System Aesthetics: RAL Peacock Blue (PB11) finish with high-durability epoxy coating

This customized 20-ton Heavy Duty Hydraulic Upender (Model SJG20-90) has been engineered by our technical team to automate the vertical rotation of massive concrete shield tunnel segments. Our client, Sinohydro Bureau 7 under the Power Construction Corporation of China (PowerChina), is a leading state-owned infrastructure conglomerate specializing in mega-scale subway, hydro-tunnel, and municipal transit boring projects.

During the shield tunneling process, curved precast concrete lining segments (each weighing up to 10 tons) are transported horizontally. To assemble these into a complete, pressure-resistant circular tunnel ring with an outer diameter of up to 7.8 meters, two matching semi-circular segments must be placed together, welded, and bolted firmly. Once assembled horizontally, the entire 20-ton circular ring must be flipped 90 degrees vertically so it can be picked up by the tunnel boring machine’s (TBM) erector arms.

To handle this extremely heavy, high-impact process, we engineered a customized pit-mounted, low-profile hydraulic upender. This system integrates seamlessly into their TBM assembly workshop, designed in compliance with European EN 1570-1 safety requirements and ISO 4413 hydraulic fluid power standards  to ensure absolute reliability. This heavy-duty system is an essential part of our premium engineering catalog of upenders and tilters .

Challenge & Solution

Challenge

The primary engineering challenge of this heavy infrastructure project was preventing structural deflection and securing the eccentric 20-ton load during its 90-degree transition. When two semi-circular segments are bolted together on the platform, they form a massive 

Φ7.8 mring. During tilting, the curved concrete structure is prone to lateral sliding or sliding along its radial axis.

We resolved this through precise mechanical and structural engineering:

  • Large-Radius Adjustable V-Groove: We engineered a specialized large-radius V-groove structure directly into the 3×4.8 mclamping platform. This saddle is geometrically configured to support and self-center the curved outer profiles of the 6.6 m, 7.2 m, and 7.7 m diameter concrete segments.

  • Dual-Edge Bolt-Locking Slots: To securely clamp the concrete rings and prevent sliding under gravity during rotation, we pre-drilled two heavy-duty bolt-locking slots into the corresponding edges of the platform. This allows operators to run high-tensile tensioning bolts directly through the concrete segment flanges and anchor them firmly to the platform frame.

  • Ultra-Rigid Frame Steel (J30020010): To eliminate the risk of structural warping, the L-cradle framework was fabricated from thick, heavy-duty J30020010 mm rectangular structural steel tubes and a 4mm plate surface. This provides massive resistance against compound bending moments during the 5-minute rotation cycle.

Solution

Operating inside an active, low-ceiling subway segment assembly workshop presented our engineers with strict spatial constraints. At maximum 90-degree extension, the overall vertical height of the tilted 4.8×7.8 mplatform was strictly limited to under 8,900 mm (8.9 meters) to prevent any collision with the overhead traveling cranes.

To meet this clearance constraint, we designed a low-profile base chassis that recesses deep into the workshop floor. We fabricated the bottom framework to sit low in a custom-designed pit, minimizing the table’s self-height.

The hydraulic system utilizes a high-torque 15 kW power unit paired with dual high-capacity cylinders with a Φ150−Φ105 mm bore-to-rod ratio. The hydraulic lines are fitted with integrated pipeline explosion-proof safety valves and pilot-operated check valves, keeping the fluid pressurized and locked in place in case of a sudden hose tear.

The electrical system consists of an external 3-phase 380V, 50Hz control cabinet with high-quality Delixi components, complete with a wired handheld pendant. The control box wiring and signal cables are routed through tidy, covered stainless steel wire trays.

If your underground tunneling project or precast concrete plant requires a customized, high-capacity Heavy Duty Hydraulic Upender, please contact our engineering team  to receive a free, factory-direct design consultation.

Technical Specifications

Parameter Delivered Specification / Value (SJG20-90)
Model Designation SJG20-90 Customized Heavy Duty Hydraulic Upender
Rated Load Capacity 20,000 kg (44,092 lbs) continuous tilting payload
Lifting Tilting Angle 90° (Dual-cylinder electro-hydraulic single-direction rollover)
Platform Table Dimensions
3,000 mm×4,800 mm+4,800 mm×7,800 mm

 (

9.84 ft×15.74 ft+15.74 ft×25.59 ft

)

Compatible Ring Diameters
Φ6.6 m

, 

Φ7.2 m

, and 

Φ7.7 m

 circular concrete segments

Lifting Table Self-Height Ultra-low profile, recessed flush inside concrete pit
Max Elevated Height at 90°
<8,900 mm

 (

29.20 ft

) to clear crane clearance

Full Tilting Cycle Duration
≤5

 minutes (Uniform speed, shock-free deceleration)

Platform Frame Steel Tubing Extra heavy-wall rectangular steel J30020010 mm
Platform Deck Plate Thickness 4 mm (0.15 in) Solid Steel
Lifting Hydraulic Cylinders Dual cylinders, Bore/Rod: 

Φ150−Φ105 mm

 with hard-chrome plated rods

Hydraulic Pump Motor Power 15.0 kW AC Power Pack (380V, 50Hz, 3P)
Segment Clamping Interface Multi-radius V-grooves + dual-edge pre-drilled bolt slots
Hose & Cable Management Fully enclosed layout inside protective covered heavy-duty wire trays
Electrical Components Brand Delixi heavy industrial electrical components with wired pendant
Equipment Protective Paint RAL Peacock Blue (PB11) Corrosion-Resistant Finish